THOR – Built and shipped!
June 21, 2021
Cavitas Energy Limited Managing Director, Steve Johnstone, takes a moment to talk about forthcoming projects.
If you have:
· Viscous oil production challenges.
· Downhole wax/asphaltene flow assurance challenges.
· Premature ‘liquid-loading’ in gas wells.
Then THOR may well be the solution. To find out more about the most cost-efficient, lowest carbon, targeted downhole heater available on the market please get in touch today! Email us at: info@cavitas.co.uk